Our focus for land development clients is using modern ground improvement and in situ testing methods to reduce construction timeframes, lower construction costs, improve quality, reduce risk and reduce your environmental footprint.
Situations include:
- Commercial, industrial and residential sites (including contaminated and problematic sites)
- Data centres
- Civil infrastructure (e.g. residential subdivisions)
- Roads
- Drainage, Water & Waste Water and Cable Trenching
- Quarry infill – rehabilitating or repurposing empty, dormant, or exhausted quarry sites, transforming them into residential, commercial, or recreational spaces, or filling them with materials to stabilise the land
- Landfills (active and closed) – For active landfills, we increase capacity, allowing for more efficient use of landfill space and extending the landfill’s operational life. For closed landfills, we accelerate settlement and improve the effectiveness of capping layers to prevent gas leakage. Often, closed landfills become local government sporting fields where an even playing surface is highly desirable.
Insitutek don’t just provide technical solutions – we inspire progress. In an industry often bound by convention, we lead with innovation, empowering you to break new ground across Australia, New Zealand and the Pacific.
We engage deeply, forging partnerships that elevate businesses and challenge the status quo. We envision a smarter, more resilient future for civil construction – where technology, expertise, and collaboration drive lasting impact.
Excel – not just in your projects, but in shaping a stronger industry and a better society.
Typical conversations with land developers are around answering questions like:
- How to convert an uncontrolled fill site into engineered fill site, without remove and replace
- How to compact much deeper lifts of freshly placed or in situ material and test the compaction integrity
- How to accelerate settlement or minimise differential settlement
- How to increase placed loose lift thickness (even double) with standard vibratory rollers and then test compaction
- How to increase compaction uniformity and eliminate under and over rolling
- How to reduce time between compaction testing and getting results
- How to assess compaction at all stages for trenching and trench backfill
What questions are you looking to answer? We’d love to hear from you.
Clients in this sector:
Related Services
Related Solutions
Civil Construction
Alternatives to Traditional Compaction Control Assessment – Standards and Specifications
Current earthworks specifications often rely on the assumption that there is a direct correlation between density and modulus (i.e. the greater the density achieved, the higher the modulus of the...
Civil Construction
How to Assess Compaction in Pipeline Trenches and around Culverts
It’s a common occurrence to see pavements settle and create a traffic hazard where trench works have been completed across a road, particularly when these trenches are installed after the...
Bearing Capacity
Three Ways To Measure Bearing Capacity For Mobile Crane And Piling Rigs Working Platforms
One of the key concerns of project managers is safety, including the risk of people getting injured or killed at site. Hence, for temporary working platforms, the need to measure...
Civil Construction
How to Increase Compaction Uniformity and Eliminate Under and Over Rolling with Intelligent Compaction
Compaction is one of the most important processes in pavement construction and, done well, leads to long-lasting pavement performance and reduced maintenance costs. Our clients use Intelligent Compaction to create...
Civil Construction
How innovative testing methods can save your clients significant time and money – Case Studies
In an industry set with challenges of staff and skills shortages, and unrealistically low pricing for some traditional test methods, our approach as an industry needs to change. What we...
Civil Construction
Are lime shortages or pricing increases an issue for you or your clients?
It’s seems like every few days we are having conversations relating to the shortage of lime supply or significant price increases. Is this an issue for you? We'd like to...
Bearing Capacity
Relationship between Density and Modulus – Practical Guidance On Use Of Light Weight Falling Deflectometers (LWDs) – June 2021
National Asset Centre of Excellence (NACOE), a collaboration of Queensland Department of Transport and Main Roads and the Australian Road Research Board (ARRB), has released their final report for the Best practice in compaction...
Civil Construction
How To Eliminate Service Trench Remediation, Post Construction In Trafficable Zones – Case Study
It’s a common occurrence to see service trench works completed across road pavements settle and create a traffic hazard particularly when these trenches are installed after the original road pavement...
Civil Construction
How to Measure Compaction on Contaminated Construction Sites – Australian Case Study
Contaminated sites present opportunities but can also pose significant risks. Asbestos and Per- and polyfluoroalkyl substances (PFAS) are often encountered by our clients. They can be found on open development sites with...
Civil Construction
How to Double the Lift Thickness (and Halve the Number of Lifts) without Compromising Compaction Quality – An Australian Case Study
It sounds so straight forward ..... halve the number of lifts by doubling the lift thickness. So why hasn't it been done more commonly before? Here is the logic. Lifts are typically...
Bearing Capacity
Measuring Bearing Capacity with the Light Weight Deflectometer
Clients are always looking for ways to get a better understanding of the ground conditions at a specific point in time, and how the bearing capacity of a site has...
Civil Construction
Why is there a shift from density to modulus based testing?
Have you noticed an increase in the number of questions relating to modulus based testing for soils? We certainly have. We are now wondering how soon this trend will gather...
Asphalt Pavement Investigation
Top 10 trends in Site Investigation and Geotechnical Testing
We find our clients are increasingly demanding more accurate and more representative results that provide better insight on what’s going on below the surface when they are designing or constructing...
Civil Construction
How to measure in-situ modulus in confined spaces and get immediate repeatable results
One of the methods for measuring dynamic modulus on site and getting repeatable results immediately is using the Light Weight Deflectometer (LWD). By measuring the modulus value, the Light Weight...
Bearing Capacity
Reliability in the Testing & Assessing of Piling Work Platforms
Reliability in the Testing & Assessing of Piling Work Platforms Cranes & Piling Rigs Technical Paper by Balfour Beatty - Ground Engineering Magazine - November 2012 Use of the Plate Load...
